赵誉.大直径长距离过江隧道盾构机盾尾泄漏的防治[J].现代交通技术,2009,(3):73-76 |
大直径长距离过江隧道盾构机盾尾泄漏的防治 |
Prevention on Shield Leakage for Shield Machine with Large Diameter in Long Distance Cross-river Tunnel Construction |
|
DOI: |
中文关键词: 过江隧道 盾构施工 盾尾泄漏 原因分析 预防措施 |
英文关键词:cross-river tunnel shield construction shield tail leakage reason analysis prevention measures |
基金项目: |
赵誉 |
北京中铁建房山桥梁有限公司,北京,102400? |
摘要点击次数: 4819 |
全文下载次数: 547 |
中文摘要: |
结合南京长江隧道盾构施工工程,分析了盾构施工中导致盾尾泄漏的各种原因,并提出了有针对性的预防措施及应急预案.确保了南京长江隧道盾构施工安全实施. |
英文摘要: |
According to shield construction of Nanjing Yangtze river tunnel project,this paper analyses the causes leading to shield tail leakage in shield construction,and the pertinence prevention measures as well as emergency plans are also proposed to ensure the shield construction safty of Nanjing Yangtze river tunnel. |